Maintenance: Power Outage Preparation; Nanaimo Campus
Scheduled Maintenance Report for Information Technology Services Advisory Page
Completed
The scheduled maintenance has been completed.
Posted Dec 27, 2017 - 18:00 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 14, 2017 - 15:00 PST
Scheduled
What is impacted: Nanaimo campus; All campus buildings except Student Residences and Building 350 (The High School)
Level of impact: Power Outage Preparation. The Facilities department has scheduled an electrical shutdown as part of required maintenance on Wednesday, December 27th. Power and network will be unavailable in the impacted buildings.
Timing: Any time before Friday, December 22, 3:00 pm
Preparation: Shut down all computers, monitors, printers, departmental multi-function units, and peripherals prior to leaving for the Christmas 2017 break. Unplug systems if possible. IT will be working with different areas to power off student use and instructional computers.
Posted Dec 13, 2017 - 14:48 PST